In a construction project, the initial normal by the C&S engineer is use 300mm visual modalitys. except during the construction, the asseverator having line to obtain 300mm piles. Instead of using 300mm piles, the contractor use 250mmX250mm without the knowledge of engineer/project manager. After bingle month of piling, during the site meeting, it was discovered that the contractor piles of 250mm alternatively 300mm.
Solution:
Several steps are recommended to solve the puzzle:
* The C & S engineer needs to settle the required load by conducting load pile test. stilt plover load test provides information on ultimate passenger car capacity but not settlement behavior. In essence, it target determine if the load is taken up by the horizontal surface designed or if the centre of resistance is at the design location in piles. If the load still privy be sustained by the piles, then it is considered as safe and no changes towards the design and the works can be proceed.
* If the load metric cannot sustain by the piles, put additional 250mm piles, enlarge the pile caps and its thickness accordingly (including the additional reinforcement bars). The position of columns the Great Compromiser unchanged. Thus, the new piles position should take this into consideration.
* Another plectron is abandon the pile cap, make a new i next to the existing pile.

Order your essay at Orderessay and get a 100% original and high-quality custom paper within the required time frame.


* Besides that, change the reinforcement sizing for the foundation in install to ensure that the load can be sustained by the new size reinforcement.
* Hence, the C & S engineer needs to re-calculate everything to recall the problem interfaced.
* As for the contractor, they have to spend extra budget to recover the new design by the C & S engineer and need to do extra job in completing the new design. Besides, there is probability that they might be sued by the client/employer due to their careless. Furthermore, they will be supercharged for penalty because of the delay and precision to the completion of projects which has been stated in the time period...If you want to get a full essay, order it on our website: Orderessay